Drawings & Building Permits
We prepare the required drawings and manage the building permit process from application to approval, ensuring compliance with all municipal requirements.
WHAT THEY AREBuilding permit drawings are technical construction documents prepared for municipal review to demonstrate that a proposed project meets applicable building code, zoning, and structural requirements.
Permit drawings help municipalities review key project requirements, including:
Structural Safety | Code Compliance | Zoning | Construction Details | Municipal Review
What Are Building Permit Drawings?
TYPES OF OPENINGSWhen Do You Need Permit Drawings?
Permit drawings are commonly required for regulated construction projects involving structural changes, building systems, occupancy, or changes to the use of a property.
New Custom Homes
Home Additions & Second Storey Additions
Basement Underpinning
Structural Basement Renovations
Load-Bearing Wall Removal
Structural Modifications
Window & Door Openings
Legal Secondary Suites
Commercial Renovations
PERMIT TIMELINE
How Long Does the Permit Process Take?
Permit timelines vary depending on the project scope, municipality, zoning requirements, and whether additional approvals are required.
Typical Timeline: 2–12+ Months
3–4 Months
Major Renovations & Structural Alterations
3–6 Months
Home Additions
4–6+ Months
Custom Homes
6–9+ Months
Projects Requiring COA or Additional Approvals
Complex projects, zoning variances, or additional approvals can significantly extend the process. If your project requires a permit, we recommend starting the drawings and application process as early as possible.
DRAWINGS + APPLICATION
Betterview Construction provides building permit drawing and application services for custom homes, home additions, and major renovations across Toronto and the GTA. From drawings and supporting documentation to municipal submission and coordination, we help manage the permit process from start to finish.
Complete Building Permit Services
Drawings → Engineering Coordination → Permit Submission → Committee of Adjustment (COA) → Hearings → Municipal Comments → Revisions → Approval
We provide building permit drawings and application services as part of our complete design build packages.
WHY PROFESSIONAL DRAWINGS MATTER
Drawings Designed for Approval and Construction
What Can Cause Delay:
Incomplete information
Code or zoning conflicts
Missing engineering details
Municipal revision requests
Drawings that don't match site conditions
Our Drawings Are Prepared To Be:
Clear for municipal review
Aligned with applicable codes
Easy for inspectors to understand
Practical for construction on site
Our goal is to minimize the need for multiple revisions and help move your project through the approval process as smoothly as possible.
LET'S BUILD YOUR VISIONLet’s Talk About Your Project
Tell us about your project and get personalized guidance through the process.