70 Toronto

Construction by BETTERVIEW

Project Overview

  • Construction
  • Expansion from 1,400 sq. ft. to 2,600 sq. ft., with a partial foundation retained (excluding the basement)
  • 10-foot first-floor ceilings, 9-foot second-floor ceilings, and 8-foot third-floor ceilings
  • Basement underpinning
  • Complete layout reconfiguration
  • Open-concept design
  • Large open-to-above feature
  • Floating open-stringer staircase
  • All new windows and doors
  • Exterior finishes: stucco and premium aluminum siding
  • Timeline: Approximately 8 months from demolition to completion
    Site challenges: no side access for machinery and an existing house lean of over 1.5 feet.